Skip to main content

Website preview prepared by Summit Software Solutions for Pamar Enterprises

Sample content, not yet live. Forms don’t send anything.

(586) 749-8593

Municipal · 2017

2017 Water Main Replacement

Over 6,000 LF of 8″ water main installation using trenchless technologies, with concrete pavement replacement in a densely populated Fraser subdivision.

Pamar excavator loading a haul truck beside a residential street

Scope of work

  • Over 6,000 LF of 8″ water main installed with trenchless technologies
  • Concrete pavement replacement within a densely populated subdivision

Related projects

All projects
  • Concrete sewer pipe set inside a lined shaft

    Municipal

    CSO #3 & #5, Phase II, Control #123688

    Installation of sanitary sewer, 2,500 LF of 8″ through 24″, and over 10,000 LF of 12″ through 42″ C76-IV RCP storm sewer.

    Location
    Dearborn, MI
    Owner
    City of Dearborn
  • Pamar crew and excavator at an open water main trench

    Municipal

    Water Main Replacement and Road Resurfacing

    Pipe bursting 27,000 LF of 6″ and 8″ diameter pipe up to 10″ diameter HDPE SDR pipe, with milling and resurfacing of over 5 miles of residential roads.

    Location
    Rochester Hills, MI
    Owner
    City of Rochester Hills
  • Pamar crew working inside a lined shaft

    Municipal

    Section 24 Area 3, Southfield

    Pump station with wet well, 4,200 LF of water main, 4,200 LF of sanitary sewer (10″ to 30″), and concrete pavement replacement in Southfield neighborhoods, including partial reconstruction of 10 Mile Road.

    Location
    Southfield, MI
    Owner
    City of Southfield