Skip to main content

Website preview prepared by Summit Software Solutions for Pamar Enterprises

Sample content, not yet live. Forms don’t send anything.

(586) 749-8593

Municipal

Section 24 Area 3, Southfield

Pump station with wet well, 4,200 LF of water main, 4,200 LF of sanitary sewer (10″ to 30″), and concrete pavement replacement in Southfield neighborhoods, including partial reconstruction of 10 Mile Road.

Pamar crew working inside a lined shaft

Scope of work

  • Pump station installation with wet well
  • 4,200 LF of water main
  • 4,200 LF of sanitary sewer, 10″ to 30″ diameter, open cut trench method
  • Concrete pavement replacement in residential neighborhoods
  • Partial reconstruction of 10 Mile Road, a major thoroughfare

Gallery

  • Pamar excavators grading a work site

Related projects

All projects
  • Concrete sewer pipe set inside a lined shaft

    Municipal

    CSO #3 & #5, Phase II, Control #123688

    Installation of sanitary sewer, 2,500 LF of 8″ through 24″, and over 10,000 LF of 12″ through 42″ C76-IV RCP storm sewer.

    Location
    Dearborn, MI
    Owner
    City of Dearborn
  • Pamar crew and excavator at an open water main trench

    Municipal

    Water Main Replacement and Road Resurfacing

    Pipe bursting 27,000 LF of 6″ and 8″ diameter pipe up to 10″ diameter HDPE SDR pipe, with milling and resurfacing of over 5 miles of residential roads.

    Location
    Rochester Hills, MI
    Owner
    City of Rochester Hills
  • Pamar excavator loading a haul truck beside a residential street

    Municipal · 2017

    2017 Water Main Replacement

    Over 6,000 LF of 8″ water main installation using trenchless technologies, with concrete pavement replacement in a densely populated Fraser subdivision.

    Location
    Fraser, MI
    Owner
    City of Fraser